Dam construction crane Usage

Dam vinci slurry prepared in the ground, concrete, masonry, materials permits the higher floors. Ease of use and quiet operation as well as job-loss offers benefits in terms of physical strength and a waste of time. Electric and gasoline engine options are available. For buy https://siparis.conaylar.com You can go to.

Geared crane cnc

Dam Crane Gear

Buy

Construction crane dam User guide

  1. Control overhead crane machine frame of the first job to be done for the installation are installed in the machine is fixed at the top and with a spirit level on the scale in parallel with the above clamp.
    pictured above mentioned clamp supplied with the machine by removing the intermediate roof or floor, as seen in photos safe and secured in a healthy way.
  2. Auth your machine's engine and interface cables to the absolute by a qualified electrician. pulling back on first run switch arm, working upwards rope, make sure you activated the automatic lever. (Note: The switch arm is retracted rope up, arm should be way ahead itiner by rope down.)
    Mechanical and electrical connections are safe and hooks attached to the bucket panel firmly made.
  3. The withdrawal of the grounding conductor in electric models are strictly necessary. Otherwise, any negative situation, our company will not accept liability in any way.
  4. Mechanical lifting capacity depending on the height and the electrical voltage; It may drop about 500 kg to 200 kg capacity.
  5. The operators who will work at the machine safe and do not put anything into the bucket in the first few running to work in a healthy way and get used to the operator the machine running idle is provided.
  6. Caring for your machine by removing the plug from power after the end of each business, employees moving parts (rollers, ropes ... etc.) it will be lubricated with grease. No matter how often your machine lubrication life would be so long.
  7. CONTROLS OF YOUR MACHINE IS MADE, DELIVERY HAS BEEN WORKING CONDITION in. ERROR AGAINST RESULTING FROM THE WORKSHOP 1 (ONE) YEAR WARRANTY. ENGINE AND ELECTRICAL PARTS, GUARANTEE is EXTERNAL.

large and heavy objects in places where there is not enough manpower taken from a work by means of machines called the crane to lift the vehicle for introducing elsewhere. Generally used in the building sector construction craness dam vinci, purse seine winch, monorail crane and gantry crane including consists of 4 types.

For technical specifications and user manual Click.

Share it!
avatar
1 Comment threads
0 Thread replies
0 Followers
Most reacted comment
Hottest comment thread
0 Comment authors
Recent comment authors
Subscribe
newest oldest most voted
Notify of
trackback

[...] Click here to read our article on dam construction crane construction elevator or user manual. [...]